PROCESS FLOW DIAGRAM




COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER DRAWING LEVEL
PART NAME REV No.
PART No. DATE INITIATED
    LAST REVIEW DATE
WEBROY STOCK CODE REVISION DATE 2021/01/25
MANUFACTURING LOCATION Webroy STATUS
MQC TYPE SAFETY CRITICAL
Current
Process Flow Key

Process TypeImage
PROCESS
MOVE
STORE
INSPECT


STEPCost CentrePROCESSOPERATION DESCRIPTIONCLASSPRODUCT AND PROCESS CHARACTERISTICSCONTROL METHODS 
1500 Receiving and verification of raw material by stores personel CC Mild Black Wire 4.0mm mild black wire as per purchase orderVerification of delivery note and order placed . Any discrepancy
2500 Move material to receiving storage area CC Safe handling during transport and handling activityVisual inspection
3505 Inspection of raw material by Q.A CC Mild black 4mm wire , wire tolerance +/- 0.05mm , No score marks , no rusty wire , compare tensile strength with COA and spec - correct gradeCheck wire diameter with micrometer. Visual inspection of condition of wire. COA from supplier. Record on incoming inspection document. Rod spec from supplier
4500 Move raw material to storage area for storage CC Safe loading and handling during this activityVisual inspection during this activity . Competent forklift driver , FIFO system to control material
5500 Issue wire to production Correct identification of wireMaterial buff tag Visual inspection
615 Select 4mm tooling / select 50% T6 programme and set machine - Zukron / Huron to form individual wires Correct setting of machine Products to conform to checking fixtureRecord on BIS Card and Attribute sampling sheet QD:203 Checking fixture verification
715 Start production SC Products need to conform to checking fixture / drawing specificationsChecking fixture - visual verification
815 Send loops to supplier for over moulding of products As per drawing requirementsVisual inspection and measurement at supplier
9500 Receive over moulded products from supplier , receipt into stock Products must conform to drawing specificationsVisual inspection
10500 Issue loops to production Safe handling and packing of productsVisual inspection
116 Call - up 50% welding programme from call unit at robotic welder Ensure correct programme is selected Visual verification
126 Load welding jig , weld and in-process inspection of finished frames SC First-off sample must conform to drawing requirementsVerification on checking fixture - record on BIS Card . Should the parts not fit the checking fixture , stop process and report to supervisor
136 Pack products into carboard boxes As per packaging requirementsDescription of product as per packaging requirments
146 Move completed boxes to stores using pallet jack Safe loading and transporting of framesVisual verification
15500 Receive boxes into stores area for shipment Correct quantities of frames Visual inspection Approved transporter
16500 Dispatching of frames Safe handling of boxes during this activityVerification of quantities as per sales order and delivery note
17505 Lay-out inspection All requirement stipulated on drawing and customer requirementsCompetent Q.A personnel conducting inspections