MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2023/12/11
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving raw material - Stores PersonnelReceivingReceipt of delivery of goods Check for correct quantity delivered, type, Diameter. Check for COAVisual inspection and verification as per orderDelivery note and orderEvery batch Goods receive note book / delivery note If non-compliant - contact supplier and inform Quality Manager and Production planner
2Move raw material to incoming inspection areaTransportRaw material Store material properly in baysVisual inspectionAs per FIFO systemEvery batch Visual inspection and FIFO board If difficulty occurs in storing raw material properly, inform Stores Coordinator
3Raw material incoming inspection by QA PersonnelInspectionRaw material SC Correct Diam - 6.5mm (WIRE/MBH2/0650). & 4.5mm (WIRE/MBH2/0450). Tolerance - +/- 0.08mm. Correct type - SWM - B. Tensile range = 550mpa - 750mpa. No rusty wire. No score marks. No excessive drawing soap Visual inspection and measure with a MicrometerAs per incoming raw material inspection planEvery consignment Goods receive note book / record findings on incoming inspection record sheet Any non-conforming material shall be isolated - properly tagged and placed in quarantine store - inform Quality Manager , Stores co-ordinator , Production planner and supplier
4Move wire to storage area for safe stackingTransportRaw material Safe stacking of wire coils onto racks as per allocated areas and FIFO systemVisual inspectionAs per FIFO SystemOn receiving FIFO information board and Rack identification Any difficulty experienced during this activity report to Stores Coordinator
5Issue raw material to Production PersonnelIssuingRaw material Correct wire to be issued as per job cardVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to ProductionEvery job as per request Job card / route card Should the incorrect wire be issued to Production, stop process, correct and inform Stores Coordinator
6Issue brackets to productionIssuingBrackets Correct brackets to be issued as per job cardVisual inspectionEvery batch issued to productionEvery job as per request Job card / route card Should the incorrect brackets be issued to production , stop process and inform store co ordinator
7Form wire no 1 - outer frame wire on Huron Machine FormingWire no. 1 Outer wire SC Wire shall conform to checking fixture , wire to sit flat in grooves on fixture to prevent fitment issues. Visual Inspection. Verify fitment on in-process checking fixtureFirst-off sampling , In process inspection and last off First-off start of shift and In process every hour last-off at end of shift 6102
6103
Record on Electronic system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
8Form wire no 2 - Inner wire on ZukronFormingWire no. 2 Inner wire SC Wire shall conform to checking fixture requirements Visual Inspection. Verify fitment on in-process checking fixtureFirst-off sampling , In process inspection and Last-off samplesFirst-off at start of shift -and in process inspection every hour - Last -off end of shift 6104
6105
Record on Electronic system Should the first-off sample fail, stop process - reset machine and redo First-off . Any further non-conformance report to Supervisor
9Form wire no 3 Inner wire on HuronFormingWire no.3 Inner wire SC Part shall conform to checking fixture requirementsVisual Inspection. Verify fitment on in-process checking fixtureFirst-off sampling 3 samples In process inspection 9 samples Last-off 3 samplesFirst-off at start of shift -and in process inspection every hour - Last -off end of shift 6106
6107
Record on Electronic system Should the first-off sample fail, stop process and reset machine,redo first-off. Any further non-conformance report to Supervisor
10Form wire no 4 - lower wire on HuronFormingWire no. 4 Lower wire SC Part shall conform to checking fixture requirementsVisual Inspection. Verify fitment on in-process checking fixtureFirst-off sampling , In process inspection and Last-off First-off at start of shift - in process inspection every hour - Last -off end of shift 6108
6109
Record on Electronic system Should the first-off sample fail, stop process and reset machine, redo first-off. Any further non-conformance report to Supervisor
11Welding Outter frame wire to bracketWeldingOuter frame wire to bracket SC Pull test to be conducted upon First-off - spec -1100Nm minium. Weld settings correct. No miss weld, broken weld, weak weld and smash weld. No rust on brackets.Verify weld paramater settings and record on system. Visuall inspect bracket for any rust. Visually inspect weld condtion.Every batchPull test upon First-off for every batch . Pull test shall be 1100N minimum 6110
22548
22549
Record on Electronic system Any difficulty experienced during this activity follow stop, call, wait procedure and report to supervisor
12Welding nut and pin onto bracketWeldingNut and pin onto bracket Shall conform to drawing requirements. Good weld penetration between nut/ bracket and pin. Nut welded centrally onto bracket. 100% inspection of nut application. 100% visual inspection on welded nut for centrality. Validation of ceramic sleeves prior to welding. As per work instructionFirst-off destructive test performed on pin and bracket, drop test from height of 1.2m to determine weld strength of pin. 6112
6113
22531
6092

1113

Record on Electronic system Should any difficulty occur, stop and report to supervisor.
13Load welding jig for welding armrestLoadingWires Wires shall fit welding jig properly - no skew / non conforming wires to be loaded in jigVisual inspectionAs per work instruction 238Every batch N/A Should any difficulty occur , stop and inform Supervisor
14Weld armrest in jigWeldingWires No loose welds / no smash welds - all welds shall conform to drawing specificationsVisual inspection100%Every order Record on Electronic system Should any difficulty occur , stop and inform Supervisor
15Inspect armrest in final checking fixtureInspectionArmrest SC Armrest shall conform to final fixture , all wires on frame to fit in slots and not above to prevent fitment issues at customer 100% inspection to ensure parts is drop fitting in fixture and wires on frame are fitting correctly on slots as required As per work instruction 238Entire batch 6114
6115
Record on Electronic sytem Should any difficulty occur such as frames not drop fitting in fixture or wires fitting too high on slots on fixture , stop and inform Supervisor / Q.A
16Pack armrests in binsPackingArmrest Correct quantities, correct packaging methodVisual inspectionAs per work instruction 238Entire batch Record on F.A Card Any difficulty experienced during this activity - stop process and report to Supervisor
17Transport Armrest to stores TransportArmrest Correct bins and quantityVisual inspectionAs per job orderEntire batch F/A Card Any damage during transport activity shall be reported to Supervisor and Stores Coordinator
18Receipt Armrest to storesReceiptingStock Correct quantities into stock systemVisual / verification to orderEvery batchEntire order Order confirmation Any shortage of products shall be reported to stores co ordinator
19Prepare order as per customer order requirementsOrder preparationOrder quantities Correct quantities - correct packaging - clear labellingVisual / verification to orderEntire orderEvery order Invoicing and delivery note - confirmation of accuracy Any incorrect information found shall be reported immediately
20Ship products to customerTransportBatch of parts Correct loading and proper stacking of containers in truckVisual / verification to orderEntire orderEvery order Delivery note / invoicing Any problems experienced during transport activity shall be reported to Stores Coordinator immediately
21Layout functional inspectionInspectionCompleted part Full dimensionalAs per customer requirements1 Complete productAs per schedule Audit sheet Should the functional layout fail the Production manager shall be informed immediately.