MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2024/05/21
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw materials by stores personelReceivingRaw material Check for correct quantity delivered, type and diameterVisual inspection and verification as per orderDelivery Note and orderEvery Batch 1090
Goods Receive Note Book / Delivery Note Should there be any discrepancies - inform Production planner / supplier immediately and make note on POD
2Move material to receiving storage areaTransportRaw material Store material correctlyVisual InspectionAs per FIFO SystemEvery Batch Visual inspection and FIFO board If difficulty occurs in storing raw material properly, inform Stores coordinator
3Inspection of raw material by QA personelInspectionInspection SC Spring black wire. TSG 3531G - SWB.WIRE/SBS3/0380 & WIRE/SBS3/0500. correct diameter 3.8mm +/- 0.035 and 5mm +/- 0.045. No score marks, no rust on wire. Correct tensile 3.8mm = 1373mpa to 1569mpa and 5mm = 1460mpa to 1650mpa. Visual Inspection / MicrometerAs per incoming raw material inspection plan QD207Every consignment 6080
6081
1120
Goods Receive Note Book / Buff tag and record findings on electronic system Any non-conforming raw material shall be isolated. Raise a SRAN and inform stores coordinator
4Move raw material to dedicated area for storageStorageRaw material Safe stacking of wire coils as per allocated areas and FIFO systemVisual InspectionAs per FIFO SystemOn receiving FIFO information board and rack identification Any difficulty experienced during this activity report to Stores Coordinator
5Issue wire to productionIssuingRaw material Correct wire to be issued as per route card.Verification as per buff tag. Setter to verify wire diameter with Vernier.Every coil issued to production.Every job as per request Route Card Should the incorrect wire be issued to production, stop the process, correct and inform Stores coordinator.
6Straighten and cut wire to lengthStraighten and cutCut lengths Correct length = 262.5mm - 263mm No burrs on ends Wire must be straight, no twistMeasure with tape measure. Visual inspection for burrs and straightnessFirst-off sample In-process inspectionFirst-off at start of production. In-process 1 part every hour and last off 6125
6126
Record on line inspection system Should the first-off sample fail stop process and reset machine and re-do first-off
7Form wire on Wire FormerFormingWire forms SC Form wiresVisual inspectionAs per work instructionFirst-off at start of production, in-process 1 part every hour and last off 6082
6086
12392
1117
Record on electronic system Should the first-off sample fail, stop process and reset machine and re do first-off sample and inform supervisor
8Induction heat treatment of wire after formingHeat treatmentTemperature SC Induction heat wire after forming at 300°C +20°CDigital infrared thermometerTemperature of induction heating Weekly 22542
Record of online inspection Any difficulty experienced during this activity stop the process and report to supervisor
9Load wire forms on kanbanLoadingWire forms Load wires correctly on kanbanVisual inspectionFull KanbanEvery batch NA Any difficulty experienced during this activity stop the process and report to team leader
10Load wire forms into mouldLoadingWire forms As per work instructionVisual inspectionEvery batchEvery part N/A Any difficulty experienced during this activity stop the process and report to team leader
11Moulding of wire formsMouldingWire forms Correct injection as per requirement. Correct mould parameters . Ensure gate nozzles are turned off when not in use to avoid degradation of the plastic and carbonisation of nozzles.Visual InspectionAs per job requirementEvery part 23619



1260



N/A Any difficulty experienced during this activity stop the process and report to team leader
12Strip part from mould and inspectStripping and inspectingMoulded wire forms Correct injection. No missing pieces of plastic. No sprue & sharp edges. Overmoulded wires completely covered, look for under shooting. Operator initial on R/H side plastic moulded piece.The center part of the mould plastic not burnt & sticky. No short shots.Visual Inspection and verification on final checking fixture. First-off verification by Q.A First-off inspection In process inspection and last offEvery batch 6085
6088
12391

1261

Record on electronic system Any difficulty experienced during this activity stop the process and report to team leader
13Load parts into binPackingCompleted parts Correct quantity 15 parts per bin / 25 bins per pallet. Bin No. 4633Visual inspectionAs per works orderEvery job as per request FA Card Any difficulty experienced during this activity stop the process and report to team leader
14Transport part to storesTransportCompleted parts Correct bins and correct quantityVisual in spectionAs per works orderEvery job as per request FA Card Should any difficulty occur during transportation inform supervisor
15Receipt parts into storesReceiptingCompleted parts Correct quantity to be entered into stock systemVisualEvery jobEvery order 1094
FA Card Any discrepancy shall be reported to stores coordinator
16Dispatching of partsTransportTransport Correct loading of boxes and safe handling during transport activityVisualEvery jobEvery order 1101
Delivery note / Invoice Any difficulty experienced during this activity stop the process and report to Stores coordinator
17Layout function inspectionInspectionInspection Full dimensionalAs per drawing and customer requirements1 Complete partAs per schedule Audit sheet Should the functional layout fail, the production manager shall be reported immediately.