MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2023/02/08
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw materialReceivingReceiving Check for correct quantity delivered, Correct Material Visual inspection and verification as per orderDelivery note and orderEvery batch 1090
Goods receive notebook / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move material to receiving storage areaTransportTransport Store material correctlyVisual inspectionAs per FIFO systemEvery batch Visual inspection and FIFO board If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by QA personnelInspectionInspection Mild Black Wire SAE 1008 Part No. WIRE/MBH2/0500 Correct diameter = 5mm +/- 0.08. No score marks - no rusty wire. Correct tensile 500 to 750 mpa Verify material compositions Visual inspection Micrometer for wire diameter COA from supplier - record findings on incoming inspection documentAs per incoming raw material inspection QD207Every consignment 1059
1120
Goods receive notebook / Buff tag and record findings on incoming receiving inspection no. 1059 Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4Move raw material to dedicated area forstorageStorageStorage Safe stacking of wire coils on to racks as per allocated areas and FIFO systemVisual inspectionAs per FIFO systemOn receiving FIFO information board and rack identification Any difficulty experienced during this activity report to Stores Coordinator
5Issue wire to productionIssuingIssuing SC Correct wire to be issued as per job cardVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to productionEvery coil Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6Cut Wire to lengthCut WireCut Wire SC Cut wire to length 223mm +- 1mmVisual inspection Tape Measure to measure lengthFirst-off sample In-process inspection First-off at start of production. In-process 1 part every hour and last off 1061
2061
1068
Record first-off and in-process inspection on BIS card Should the first-off sample fail stop process and reset machine and re-do first-off
7Sub contract chamfer and machine groovesSub ContractStraight Wires SC Chamfer placement and angle Grove placement and angleVisual InspectionEvery batchEvery batch NA Any difficulty report to the Webroy Production Manager
8Receive chamfer & grooved part from sub contractorReceivingChamfered & Groove Part Chamfer and groove position and angleVisual InspectionSample Inspection during receivingEvery batch 1063
Receiving Inspection Sheet Any issues report to Production Manager and Quality Supervisor
9Issue chamfered and grooved wire to productionIssuingSub-Component Part Correct sub-component as per router cardVisual InspectionCheck part and qty issued against route cardEvery batch Route Card If difficulty during this process report to Stores Supervisor and/or Production Supervisor
10Form part on bending machineBendingWire SC Bend as per drawing. Correct bends/rotate. Parts shall drop fit into checking fixture. The part must sit flat in the fixture and have no gaps, the part must not fit higher then the pins. Measure height of leg which shall be between 8mm - 9mm. Check locking bolt for sensor is not stripped/worn.100% visual inspection of correct fitment and measure leg height with a vernier.First off inspection In process inspection Last-off100% visual inspection.
1073
2063
15427
1064
2062
15426

1067
record on online inspections. Any difficulty during bending, stop report to Production Supervisor. For any stoppages a new first-off shall be done to re-qualify th e production run.
11Send parts for Electro Plating Electro PlatingBent parts Surface and Heat Treatment as per TSH6524G-BCVisual inspectionEvery batchEvery batch N/A Any difficulty report to Production Manager
12Receive Electro plated partsReceiving Electro plated parts Surface and Heat treatment as per TSH6524G-BC. Surface finish must be bright/shiny with no visible damage or marksVisual inspectionEvery batchEvery batch 1065
N/A Any issues report to Quality supervisor and Production manager
13Apply Paint I.DPaint I.DPainted Part 69311-0A090 - Apply Orange Paint I.D. and 69312-0A100 - Apply Green Paint I.D Visual verification First-off, In-process inspection and Last offEvery batch 1066
2064
1075
2065
1088
Record every hour on BIS Card Any difficulty report to supervisor
14Transport product to storesTransportTransport Use plastic bin size 4311 Place 300 parts in each boxVisual inspectionAs per works orderEvery batch F/A Card Should difficulty occur during transport inform Supervisor
15Receipting product to storesReceiptingReceipting Correct quantity to be entered on to the stock systemVisualEvery batchEvery order 1094
F/A Card Any discrepancies shall be reported to the Stores Coordinator
16Packing of final productPackingPacking Correct quantity per bin Correct binVisualAs per work instructionEvery job F/A Card Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
17Dispatching of productsTransportTransport Correct loading of bins and safe handling during transport activityVisualEntire orderEvery order 1101
Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
18Layout functional inspectionInspectionInspection SC Full dimensiomalAs per customer requiremetns1 Complete productAs per schedule Audit sheet Should the functional layout fail the Production manager shall be informed immediately.