MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2023/12/13
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw materialReceivingRaw material Check for correct quantity delivered, type and diameterVisual inspection and verification as per orderDelivery note and orderEvery batch



1090



Goods receive notebook / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move material to receiving storage areaTransportRaw material Store material correctlyVisual inspectionAs per FIFO systemEvery batch Visual inspection If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by QA personnelInspectionRaw material SPEC. TSG3533G. Mild wire Material grade - 42TiV01/ SAE 1045 8.0mm +/- 0.08mm. Correct tensile - 840mpa to 880mpa. No pitted rust, now score marks, no excessive drawing soap Phosphate coating as per CAR3/18Visual inspection MicrometerAs per raw material inspectionEvery consignment 1071
1120
Goods receive notebook / Buff tag and record findings on electronic sytem Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4Move raw material to dedicated area for storageTransportRaw material Safe stacking of wire coils as per allocated areas and FIFO systemVisual inspectionAs per FIFO systemOn receiving Identification tags Any difficulty experienced during this activity report to Stores Coordinator
5Issue wire to productionIssuingRaw material SC Issue wire to productionVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to productionEvery job as per request Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6Form wire on Huron 4 and inspect partsFormingWire form SC Form wire as per checking fixture. Legs must sit flat in the fixture. Part must not be forced fitted into the fixture. Both legs (front and back section) shall sit flat in fixture. Gap between the legs shall be 21mm. 100% Visual Inspection and verification in checking fixture & Breakpoint. Measure gap bewteen both legs with a vernier.As per work instruction First-off at start of production. In-process 9 parts every hour and last off 1072
2071
13402
1076
2072
13403


1081


Record first-off and in-process and last-off inspections on system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
7Packing of final productPackingCompleted product correct quantity 80 per binVisual verificationas per customer requirementEvery order



F/A Card Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
8Transport product to storesTransportCompleted product Correct bins and correct quantitiesVisual inspectionAs per job orderEvery order F/A Card Should difficulty occur during transport inform Supervisor
9Receipting product to storesReceiptingCompleted product Correct quantity to be entered on to the stock systemVisual verification.Every batch.Every order 1094
F.A Card. Any discrepancies shall be reported to the Stores Coordinator
10Dispatching of productsTransportCompleted product Correct loading of bins and safe handling during transport activityVisualEntire orderEvery order 1101
Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
11Layout functional inspectionInspectionInspection SC Full dimensional as per SDS and PIS. -As per customer requiremets1 Complete productAs per schedule Audit sheet Should the functional layout fail the Production manager shall be informed immediately.