MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2021/12/07
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
Adient-Pasdec


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw materialReceivingRaw material Check for correct quantity delivered, type and diameterVisual inspection and verification as per orderDelivery note and orderEvery batch Goods receive notebook / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move material to receiving storage areaTransportRaw material Store material correctlyVisual inspectionAs per FIFO systemEvery batch Visual inspection and FIFO board If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by QA personnelInspectionRaw material Correct material 5.0mm +/- 0.08mm mild wire. Specification - SAE1008. Tensile range - 550mpa to 750mpa. No pitted rust, no score marks, no excessive drawing soap Phosphate coating as per CAR3/18Visual inspection MicrometerAs per incoming raw material inspection QD207Every consignment 1059
1120
Goods receive notebook / Buff tag and record findings on on-line inspections Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4Move raw material to dedicated area for storageTransportRaw material Safe stacking of wire coils on to racks as per allocated areas and FIFO systemVisual inspectionAs per FIFO systemOn receiving FIFO information board and rack identification Any difficulty experienced during this activity report to Stores Coordinator
5Issue wire to production IssuingRaw material SC Correct wire to be issued as per job cardVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to productionEvery coil Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6Form wire on Micro-macFormingProduct SC Form wire as per work instruction.Visual inspection for correct fitment in Checking fixtureFirst-off sample, In-process & last off. Run parts in controlled batches of 100 AS PER CAR:21945First-off at start of production. In-process 9 parts every hour to be verified in checking fixture and bundled 6078
6079
7268
1107
Record on on-line inspection system Should the first-off sample fail stop process and reset machine and re-do first-off
7bundling and Packing of final productBundling and PackingProduct Bundle parts qty of 100 and tie down with string either end. pack onto pallet.Visualas per customer requirementEvery job F/A Card Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
8Transport product to storesTransportProduct Correct quantitiesVisual inspectionAs per works orderEvery batch F/A Card Should difficulty occur during transport inform Supervisor
9Receipting product to storesReceiptingProduct Correct quantity to be entered on to the stock systemVisualEvery batchEvery order F/A Card Any discrepancies shall be reported to the Stores Coordinator
10Dispatching of productsTransportProduct Correct loading of bins and safe handling during transport activityVisualEntire orderEvery order Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
11Internal product audit inspectionInspectionProduct As per drawing requirementsAs per customer requirements1 Complete productAs per schedule Audit sheet Should the functional layout fail the Production manager shall be informed immediately.