MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2024/09/26
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Draft
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving protector clips - Stores PersonelReceivingProtector clips Check for correct quantity delivered and type.Visual inspection and verification as per orderDelivery note and orderEvery batch 1090
Goods receive note book / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Inspection of protector clip by Q.AInspectionProtector clips SC No burrs and sharp edges. Material marking (>PP/PE<) shall be indicated on the back surface. No cracks, no deformation, no short shot. Colour - natural.Visual inspection and measure with a vernier.Measure 5 components per batch.Every batch 11380
Record on inspection sytem. Any non-conforming Protector clips shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
3Receiving raw material - Stores PersonnelReceivingRaw material Check for correct quantity delivered, type and diameter.Visual inspection and verification as per orderDelivery note and orderEvery batch 1090
Goods receive note book / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
4Move material to receiving storage areaTransportRaw material Store material correctlyVisual inspectionAs per FIFO systemEvery batch Visual inspection If difficulty occurs in storing raw material properly inform Stores Coordinator
5Inspection of raw material by QA personnelInspectionRaw material SC Mild black wire. SAE 1010/1008. WIRE/MBH2/0800. Correct diameter 8mm +/- 0.08. Correct tensile - 500mpa to 700mpa.WIRE/MBH2/0500. Correct diameter 5mm +/- 0.08. Correct tensile - 500mpa to 750mpa.No score marks, no rust on wire.Visual inspection, MicrometerAs per incoming raw material inspection QD207Every consignment 1059
6179
1120
Goods receive notebook / Buff tag and record findings on electronic sytem Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
6Move raw material to dedicated area for storageTransportRaw material Safe stacking of wire coils as per allocated areas and FIFO systemVisual inspectionAs per FIFO systemOn receiving Identification tags Any difficulty experienced during this activity report to Stores Coordinator
7Issue wire to productionIssuingRaw material Issue wire to productionVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to productionEvery job as per request Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
8Form Straight Wire on Zukron 3FormingStraight wire SC Wire shall conform drawing , Wire must be straight. No rust, Score Marks and Burrs. Overall length - 305mm +/- 1.5Visual Inspection and measure length with a tape measure. First-off verification by Q.AAs per work instructionFirst-off at start of production. In-process 9 parts every hour and last-off 11373
11374
11375
1186
Record on Electronic system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
9Form U Wire on Zukron 3FormingU wire SC Wire shall conform to checking fixture , wire to sit flat in fixture. Overall length - 310mm +/- 1. Leg lengths - 26.6mm +/- 0.5. No rust, Score Marks and Burrs.Visual Inspection and verification in checking fixture. First-off verification by Q.AAs per work instructionFirst-off at start of production. In-process 9 parts every hour and last-off 11376
11377
11378
1185
Record on Electronic system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
10Form Outer Wire on 12mm HuronFormingOuter Wire SC Wire shall conform to checking fixture , wire to sit flat in fixture DATUM points.Both legs must be flat. No rust, Score Marks and Burrs. Visual Inspection and verification in checking fixture. First-off verification by Q.AAs per work instructionFirst-off at start of production. In-process 9 parts every hour and last-off 11369
11370
11371
1178
Record on Electronic system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
11Transport Indivual Wires to Spot WelderTransportIndivual Wires Correct handling of parts during this activityVisual verificationN/AEvery order N/A Any difficulty experienced during this activity stop the process and report to Supervisor
12Dressing and cleaning of copper tipsCopper tipsClean tips set to correct height SC Clean and set to correct height. Heights 190mm top and 167mm bottom tip which will have a gap of 55mm between the copper tipsMeasure heights with a Tape measure or Steel ruleHeights set prior to welding Cleaning of copper tips every 2 hoursEvery 2 hours 16435
Record on inspection system Any problem experienced during this activity report to supervisor.
13Break Strength TestTensile TesterBreaking strength SC Break strength of weld portion shall be material failure.Use the tensile tester to pull the sample wires until the wire breaks or the weld fails. Wires from the current batch of wire are to be used for the test.1 part per batchEvery batch 16434
Record on inspection system If the test fails, stop and call the supervisor.
14Load Indivual Wires in welding jig LoadingCorrectly loaded welding jig. Correct loading of wires into the loading jig to ensure a good weld.Visual inspection to ensure wires are touching, no gaps. Ensure all hold-down clamps are in place.Visual inspectionEvery order 1174
Visual inspection. First-off in sample inspections Any difficulty in loading jig, stop the process and call the supervisor.
15Welding Seat CushionWeldingWelded part Welding of partPart to meet drawing and customer requirements No smash welds, no miss welds, no broken welds and no bent wiresVisual verificationEvery part
11381
1174

Record on inspection system Should the first-off sample fail, stop process, redo first-off and retest. If 2nd first-off fails inform Supervisor immediately. Should the weld test fail, stop process and inform Supervisor immediately
16Inspect Seat Cushion in final checking fixtureInspectionWelded part SC Frames shall fit in checking fixture. Part to sit flat on DATUM points.No lift on legs allowed. No weak, broken, smashed welds allowed. No rust and burrs on frames.Visual inspection refer to work instruction for fitment requirements.Visual verification in checking fixture for correct fitment.First-off at start of production. In-process 9 parts every hour and last-off 11382
11383
11384
Record on inspection system Should the inspection requirements not be correct, stop the process and inform the supervisor.
17Transport completed parts to stores for coatingTransportWelded parts Correct quantitiesVisual inspectionAs per job orderEvery order N/A Should difficulty occur during transport inform Supervisor
18Send parts for PA coatingTransportUncoated parts Correct PA coating as per boundary sample.Visual inspectionEvery batchEvery order N/A Any difficulty report to Production Manager.
19Receive coated partsReceivingCoated parts Correct coating on parts. Correct quantity received.Visual inspectionEvery batchEvery order N/A Any issues report to Quality and Production manager
20Inspection of coated parts InspectionCoated parts SC Correct coating as per boundary sample. No cracks. Colour - black. PA coating hacthing area - 50mm + 5 - 0 PA coating thickness - 0.8mm ± 0.3Visual inspection/ verificationEvery orderEvery batch 11379
Record on inspection system Any non-conforming parts shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
21Assemble protector clip onto partAssemblyProtector clip Ensure protector clip is secure on front end hooks.Visual verification Every batchEvery order Record on inspection system Any problems experienced with assembly of protector clips shall be reported to supervisor
22Pack welded parts into binsPackingWelded parts Correct quantity = 14parts per bin. TBSA black dunage bins used for the seat backsVisual verificationAs per supplier packaging specificationEvery order Sub Contract Card Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
23Receipt parts into stockReceiptingCompleted parts Correct quantity to be entered on to the stock systemVisual verification.Every batch.Every order 1094
F.A Card. Any discrepancies shall be reported to the Stores Coordinator
24Dispatching of productsTransportCompleted parts TBSA black dunage bins used for the seat back, Pack 14 parts in each boxVisual verificationAs per job orderEvery order 1101
Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
25Layout functional inspectionInspectionParts Full dimensional as per SDS and PIS.As per customer requirements.1 complete productAs per schedule Audit sheet Should the audit fail, the Production manager shall be informed immediately.