MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2023/11/09
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
L&J


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw material by stores personnelReceivingRaw material Check for correct quantity delivered, type and diameterVisual inspection and verification as per orderDelivery note and orderEvery batch 1090
Goods receive note book / delivery note Should there be any discrepancies - inform Production planner / supplier immediately and make note on POD
2Move material to receiving storage areaTransportRaw material Store material correctlyVisual inspectionAs per FIFO System Every batch visual inspection and FIFO Board If difficulty occurs in storing raw material properly, inform Stores Coordinator
3Inspection of raw material by QA PersonnelInspectionRaw material Correct material 4.00mm +/- 0.08mm mild wire.WIRE/MBH2/0400. Specification - SAE1008. Tensile range - 550mpa to 700mpa. No pitted rust, no score marks, no excessive drawing soapVisual inspection, MicrometerAs per incoming raw material inspection planEvery consignment 6116
1120
Record on on-line inspection Any non-conforming raw material shall be placed on hold and isolated. Raise a SRAN and inform stores coordinator
4Move raw material to dedicated area for storageStorageRaw material Safe stacking of wire coils onto rack as per allocated areas and FIFO SystemVisual inspectionAs per FIFO SystemOn receiving FIFO information board and rack identification Any difficulty experienced during this activity report to Stores Coordinator
5Issue wire to productionIssuingRaw material Correct wire to be issued as per route cardVerification as per buff tagEvery job as per requestEvery coil issued to production Route card Should the incorrect wire been issued to Production, stop process, correct and inform Stores Coordinator
6Form wire on ZukronFormingProduct SC Part shall be formed with the legs flat. Part shall drop fit in the checking fixture. Appearance - No burrs, rust, marks, damage to finish - Refer CAR no. 45329Checking fixture verification, visual inspection and verification on a flat surface to check flatnessAs per work instructionFirst-off at start of production. In-process 9 parts every hour and last-off 8303
21503
21504
1229
Record on on-line inspections Should the first-off sample fail stop process and reset machine and re-do first-off
7Pack partsPackingProduct Correct quantity 500 per boxVisualas per customer requirementEvery job F/A Card Should the quantity be incorrect stop process, verify quantity and add/remove parts to meet quantity required
8Transport products to storesTransportProducts Correct quantitiesVisual inspectionAs per works orderEvery batch F/A Card Should difficulty occur during transport inform Supervisor
9Receipting product to storesReceiptingProducts Correct quantity to be entered on to the stock systemVisualEvery batchEvery order 1094
F/A Card Any discrepancies shall be reported to the Stores Coordinator
10Dispatching of productsTransportProducts Correct loading of bins and safe handling during transport activityVisualEntire orderEvery order 1101
Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
11Internal product audit inspectionInspectionProduct Full dimensionalChecking fixture verification, visual inspection, verification on a flat surface to check flatness, vernier & micrometerPIS/ SDS & Quality product audit reportAs per schedule Audit sheet Should the part fail to meet the requirements, the Production manager shall be informed immediately.