MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2024/09/27
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Draft
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving 3/16 Bundy tube lengths - Stores PersonnelReceiving3/16 Bundy tubes Check for correct quantity delivered and size.Visual inspection and verification as per orderDelivery note and orderEvery batch 1090
Goods receive note book / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move 3/16 Bundy tube lengths to receiving storage areaTransport3/16 Bundy tubes Store tubes correctlyVisual inspection.As per FIFO systemEvery batch Visual inspection If difficulty occurs in storing raw material properly inform stores coordinator
3Inspection of 3/16 Bundy tube lengths by Q.C.Inspection3/16 Bundy tubes SC Overall length - 6.00 M, No damage, distortion or burrs. Wire must fit in freely.Tape measure, visual inspection.Measure 5 components per batch.Every batch 23616
Record on inspection sytem. Any non-conforming ferrules shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4Move 3/16 Bundy tube lengths to dedicated area for storageTransport3/16 Bundy tubes Safe stacking of tubes as per allocated areas and FIFO system.Visual inspection.As per FIFO systemOn receiving Identification tags Any difficulty experienced during this activity report to Stores Coordinator
5Receiving raw material - Stores PersonnelReceivingRaw material Check for correct quantity delivered, type and diameter.Visual inspection and verification as per orderDelivery note and orderEvery batch 1090
Goods receive note book / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
6Move material to receiving storage area .TransportRaw material Store material correctly.Visual inspection.As per FIFO systemEvery batch Visual inspection If difficulty occurs in storing raw material properly inform Stores Coordinator
7Inspection of raw material by QA personnel.InspectionRaw material SC Spring steel wire. SWB TSG 3531 G. WIRE/SBS3/0200. Correct diameter 2mm +/- 0.035. Correct tensile 1471 Mpa - 1716 Mpa. No score marks, no rust on wire.Visual inspection, Micrometer.As per incoming raw material inspection QD207Every consignment 6158
1120
Goods receive notebook / Buff tag and record findings on electronic sytem Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
8Move raw material to dedicated area for storage.TransportRaw material Safe stacking of wire coils as per allocated areas and FIFO system.Visual inspection.As per FIFO systemOn receiving Identification tags Any difficulty experienced during this activity report to Stores Coordinator
9Issue 3/16 Bundy tube lengths to productionIssuing3/16 Bundy tubes Issue tubes to productionVerification as per buff tagEvery batch issued to productionEvery job as per request Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
10Issue wire to production.IssuingRaw material Issue wire to production.Verification as per buff tag Setter to measure wire diameter with vernier.Every coil issued to production.Every job as per request Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
11Cut 3/16 Bundy tubes to 'U-Clip' lengthsCuttingProduct Correct length - 50.00mm +/- 2mm, No burrs/ sharp edgesVernier, visual inspection.As per work instructionFirst-off, in-process and last-off inspection 23612
23613
23615
1258
Record on electronic system Should the first off sample fail - stop process - reset and re-do first off. Any further non-conformance report to Supervisor
12Transport 'U-Clips' to crimping pressTransport'U-Clip' Correct handling of parts during this activityVisual verification.Visual verificationEvery order N/A Any difficulty experienced during this activity stop the process and report to Supervisor
13Form wire on Zukron machineFormingWire form Wire shall conform to drawing and wire profile must comply to checking fixture, Wire must be flat. No rust, no score Marks. Burrs <0.20 mmVisual Inspection and measure length with a tape measure. First-off verification by Q.A.As per work instructionFirst-off, in-process and last-off inspection 23602
23603
23604
1254
Record on Electronic system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
14Transport formed wire to crimping press.TransportWire form Correct handling of parts during this activity.Visual verification.Visual verificationEvery order N/A Any difficulty experienced during this activity stop the process and report to Supervisor
15Assemble U-Clip and crimp.Assemble and crimpWire form Crimping of U-Clip.Part to meet drawing and customer requirements. Wire ends must be meet U-Clip dimple to ensure correct crimping. U-Clip must be assembled/ crimped securely.Visual verificationEvery part 1255
Record on inspection system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
16Inspect part in final checking fixture.InspectionCompleted products Part shall sit flat and comply to checking fixture. Ferrule to be crimped securely. No rust, burrs, damage or distortion.Visual inspection refer to work instruction for fitment requirements.Visual verification in checking fixture for correct fitment & assembly.First-off, in-process and last-off inspection 23605
23606
23607
1255
Record on inspection system Should the inspection requirements not be correct, stop the process and inform the supervisor.
17Pack assembled parts into dunnages.PackingCompleted products Correct quantity = 50 parts per bin. Bin type: 4616.Visual verification.As per packaging specificationEvery order F.A Card Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
18Transport completed parts to stores for dispatch.TransportCompleted products Correct quantities.Visual inspection.As per job orderEvery order N/A Should difficulty occur during transport inform Supervisor
19Receipt parts into stock.Receipting Completed parts Correct quantity to be entered on to the stock system.Visual verification.Every batch.Every order 1094
F.A Card. Any discrepancies shall be reported to the Stores Coordinator
20Dispatching of products.TransportCompleted parts Bin type: XXX, QTY: XXX per bin.Visual verification.As per job orderEvery order 1101
Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
21Layout functional inspection.InspectionCompleted products Full dimensional as per SDS and PIS.As per customer requirements.1 complete productAs per schedule Audit sheet Should the audit fail, the Production manager shall be informed immediately.