MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2024/05/20
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
Gabriel


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw material by stores personel.ReceivingRaw material Spring Black Wire 1.6mm wire as per purchase order.Verification of delivery note and order placed . Any discrepancy.Delivery note and orderEvery batch Goods receive note book / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move material to receiving storage area.TransportRaw material Safe handling during transport and handling activity.Visual inspection.As per FIFO systemEvery batch Visual inspection If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by Q.A.InspectionRaw material Spring black 1.6mm wire , wire tolerance +/- 0.025mm , No score marks , no rusty wire , compare tensile strength with COA and spec - correct grade.Check wire diameter with micrometer. Visual inspection of condition of wire. COA from supplier. Record on incoming inspection document. Rod spec from supplier.As per incoming raw material inspection QD207Every consignment Goods receive notebook / Buff tag and record findings on electronic sytem Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4Move raw material to storage area for storage.TransportRaw material Move raw material to storage area for storage.Visual inspection during this activity . Competent forklift driver , FIFO system to control material.As per FIFO systemOn receiving Identification tags Any difficulty experienced during this activity report to Stores Coordinator
5Issue wire to production.IssuingRaw material Correct identification of wire.Material buff tag Visual inspection.Every coil issued to production.Every job as per request Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6Coil and inspect Circlip.CoilingProduct SC Correct setting of rings as per drawing requirements. 1. I.D off coiler = 14.4mm - 14.6mm. 2. Gap off coiler = 3.8mm - 4.5mm. 3. No Burrs allowed.Record on electronic system.First off sample, thereafter 9 parts every hour and a last-off.Every batch 23593
23617
23618
1259
Record on BIS card and Record on online inspection Should any of the parts not conform to requirements - stop production: inform supervisor. Reset machine and do another first off sample.
7Transport Circlip to LTHT.TransportProduct Safe movement using a trolley to transport rings.Visual verification.Every batchEvery order N/A Any damage to parts shall be reported to Stores Supervisor
8LTHT of Circlip.LTHTProduct Safe loading and off-loading of rings..Visual verification.Visual inspection temperature.Every batch Record oven temperature on QD:52 Any difficulty experienced during this activity stop the process and report to supervisor.
9Final inspection of Circlip.InspectionCompleted products Circlip shall conform to customer/drawing requirements. 1. I.D = 13.8mm - 14.2mm. 2. Garp = 3.0mm. 3. No Burrs allowed.Record on electronic system.First-off, in-process and last off.Every batch 1259
Record results on online inspection Should the inspection requirements not be correct, stop the process and inform the supervisor.
10Transport completed Circlips to stores.TransportCompleted products Safe loading and transporting of Circlips.Visual inspection.As per job orderEvery order N/A Should difficulty occur during transport inform Supervisor
11Receive Circlips into stores area.ReceiptingCompleted products Correct quantities of Circlips.Visual inspection Approved transporter.Every batch.Every order F.A Card. Any discrepancies shall be reported to the Stores Coordinator
12Dispatching of Circlips.TransportCompleted products Safe handling during this activity.Verification of quantities as per sales order and delivery note.As per job orderEvery order Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
13Internal product audit.InspectionCompleted products As per drawing and audit requirements.Competent Q.A personnel conducting inspections.1 complete productAs per schedule Audit sheet Should the audit fail, the Production manager shall be informed immediately.