MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2025/06/05
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Draft
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving raw material - Stores PersonnelReceivingRaw material Check for correct quantity delivered, type and diameter.Visual inspection and verification as per order.Delivery note and order Every batch 1090
Goods receive notebook / delivery note. Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D.
2Move material to receiving storage area.TransportRaw material Store material correctly.Visual inspection.Visual inspection.Every batch Visual inspection. If difficulty occurs in storing raw material properly inform Stores Supervisor.
3Inspection of raw material by QA personnel.InspectionRaw material Mild black wire. SAE 1008. WIRE/MBH2/0400. Correct diameter 4.00 mm ±0.05. No score marks, no rust on wire. Correct tensile - 530 to 630 Mpa.Visual inspection, Micrometer.As per online receiving inspection planEvery consignment 6116
1120
Goods receive notebook / Buff tag and record findings on electronic system. Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Supervisor.
4Move raw material to dedicated area for storage.TransportRaw material Safe stacking of wire coils as per allocated areas and FIFO system.Visual inspection.As per FIFO systemOn receiving Identification tags. Any difficulty experienced during this activity report to Stores Supervisor.
5Issue wire to production.IssuingRaw material Issue wire to production.Verification as per buff tag Setter to measure wire diameter with vernier.Every coil issued to production.Every job as per request Route card. Should the incorrect wire be issued to production stop process, correct and inform Stores Supervisor.
6Form product and inspect.FormingProduct Product shall conform to drawing and wire profile must comply to checking fixture. No rust, no score Marks. Burrs <0.20 mmChecking fixture verification, visual inspection of rust, score marks and burrs.As per work instruction.First-off, in-process and last-off inspection. Record on Electronic system. Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor.
7Packing of products.PackingProduct Correct quantity as per job order.Visual verification.As per packaging specificationEvery order F.A Card. Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required.
8Transport completed parts to stores.TransportCompleted products Correct quantities.Visual inspection.As per job order.Every order N/A Should difficulty occur during transport inform Supervisor
9Receipt product into stock.ReceiptingProduct Correct quantity to be entered on to the stock system.Visual verification.Every batch.Every order 1094
F.A Card. Any discrepancies shall be reported to the Stores Supervisor.
10Dispatching of products.TransportProduct Correct quantities as per purchase order.Visual verification.As per job order.Every order 1101
Delivery note / invoice. Any difficulty experienced during this activity report to Stores Supervisor.
11Layout functional inspection.InspectionProduct Full dimensional as per SDS and PIS.As per customer requirements.1 complete productAs per schedule. 1180
Online audit system. Should the audit fail, the Production manager shall be informed immediately.