| PROCESS FLOW | NO | NAME | WORK ELEMENT | CHECK ITEM | RANK | PROCESS CRITERION | INSPECTION METHOD | INSPECTION PLAN | FREQUENCY | Inspection No.(s) | Work Instructions | RESP | CHECK SHEET | CONFIRM'N LEVEL | REACTION PLAN | |
| 1 | Receiving and verification of raw material | Receiving. | Raw material. |
| Check for correct quantity delivered, type and diameter | Visual inspection and verification as per order | Delivery note and order. | Every batch |
|
1090
|
| Goods receive notebook/delivery note. |
| Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D. |
|
| 2 | Move material to receiving storage area | Transport. | Raw material. |
| Store material correctly | Visual inspection | As per FIFO system. | Every batch |
|
|
| Visual inspection and FIFO. |
| If difficulty occurs in storing raw material properly inform Stores Manager |
|
| 3 | Inspection of raw material by QA personnel | Inspection. | Raw material. |
| Spring Black Wire - WIRE/SBS3/0290, 2.90 mm ±0.025. Material spec: DIN17223- . Tensile range 1373 - 1618 Mpa, Correct diameter, No score marks, No rusty wire, Correct grade, correct tensile - verify material compositions as per spec | Visual inspection Micrometer for wire diameter COA from supplier - record findings on incoming inspection document | As per incoming raw material online inspection | As per incoming raw material inspection QD207. |
|
1120
|
| Record on inspection system. |
| Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Manager |
|
| 4 | Move raw material to dedicated area for storage | Storage. | Raw material. |
| Safe stacking of wire coils on to racks as per allocated areas and FIFO system | Visual inspection | As per FIFO system. | On receiving. |
|
|
| FIFO and rack identification. |
| Any difficulty experienced during this activity report to Stores Manager |
|
| 5 | Issue wire to production | Issuing. | Raw material. |
SC
| Correct wire to be issued as per job card | Verification as per buff tag Setter to measure wire diameter with vernier | Every coil issued to production. | Every coil. |
|
|
| Route card. |
| Should the incorrect wire be issued to production stop process, correct and inform Stores Manager |
|
| 6 | Form wire on Huron | Forming. | Product. |
SC
| Correct form as per master sample | Vernier, tape measure & visual inspection | As per master sample | First-off at start of production. In-process 9 parts every hour and last-off |
|
|
| Record on system. |
| Should the first-off sample fail stop process and reset machine and re-do first-off. |
|
| 7 | Transport parts to Spring handwork department | Transport | Product |
| Safe transportation of wires | Visual Inspection | As per job order. | Every order |
|
|
| N/A |
| Should difficulty occur during transport inform Supervisor |
|
| 8 | Form hook on first/one side | Forming | Product |
SC
| Hook must conform to checking fixture. Hook length (1): 19.00 mm ±1, Hook length (2): 24.20 mm +0.50/-0, Hook height: 13.10 mm ±1, Hook width (inside)/Gap (1): 3.80 mm +0.50/-0, Hook width (inside)/Gap (2): 3.80 mm +0.50/-0 | Checking fixture, vernier & visual inspection | As per work instruction. | First-off, in-process and last-off inspection. |
|
1309
|
| Record on Electronic system. |
| Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor. |
|
| 9 | Form hook on second side | Forming | Forming |
SC
| Part must conform to checking fixture. Loop diameter: 12.00 mm ±1, Gap: 6.00 mm ±0.50, Overall formed height: 25.00 mm ±1, Length of part: 315.00 mm ±1. | Checking fixture, vernier, tape measure & visual inspection | As per work instruction. | First-off, in-process and last-off inspection. |
|
1309
|
| Record on Electronic system. |
| Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor. |
|
| 10 | Transport parts to epoxy line | Transport | Product |
| Safe handling of part during transport to epoxy line | Visual inspection | As per job order. | Every order |
|
|
| N/A |
| Should difficulty occur during transport inform Supervisor |
|
| 11 | Washing | Washing. | Products. |
| Remove oil and rust. Check chemical PH and temps are to specification. If grease remains increase wash time | Visual inspection | Every batch. | Every order |
|
|
| Record on QD329 Epoxy Process Parameters. |
| Any difficulty during washing stop process and inform Team leader |
|
| 12 | Epoxy coat part | Coating. | Products. |
SC
| Correct coating thickness, no coating defects | Coating thickness tester, visual | Coating thickness test | 1 part per batch |
|
|
| Record process parameters on QD329 Record thickness on BIS Card. |
| Any difficulty during this process report to Team leader |
|
| 13 | Packaging of parts | Packing | Products. |
| Correct quantities: 200 per box | Visual | As per work instruction. | Every job. |
|
|
| F/A Card. |
| Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required. |
|
| 14 | Transport finished goods to stores | Transport | Products. |
| Correct dunnage and quantity | Visual inspection | As per works order. | Every batch. |
|
|
| F/A Card. |
| Should difficulty occur during transport inform Team leader |
|
| 15 | Receipt parts to stores | Receipting. | Products. |
| Correct quantity be entered into the system | Visual | Every batch. | Every batch. |
|
|
| F/A Card. |
| Any discrepancies shall be reported to the Stores Manager |
|
| 16 | Dispatching of parts | Transport. | Products. |
| Correct loading of boxes and safe handling during transport activity | Visual | Entire order. | Every order. |
|
|
| Delivery note/invoice. |
| Any difficulty experienced during this activity report to Stores Manager |
|
| 17 | Layout function inspection | Inspection. | Product. |
| Full dimensional | As per fixture and customer requirements | 1 Complete product. | 1 Complete product. |
|
|
| Audit sheet. |
| Should the functional layout fail the Production manager shall be informed immediately. |
|