Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving raw material - Stores PersonnelReceivingRaw material Check for correct quantity delivered, type and diameter.Visual inspection and verification as per orderCheck for correct quantity delivered, type and diameter.Every batch 1090
Goods receive note book / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Inspection of raw material by QA personnel.InspectionRaw material Mild black wire. WIRE/MBH2/0500. Correct diameter 5mm +/- 0.08. Correct tensile - 500mpa to 750mpa.No score marks, no rust on wire.Visual inspection, MicrometerMild black wire. SAE 1010/1008. Correct diameter Correct tensile - 500mpa to 700mpa.WIRE/MBH2/0500. Correct diameter 5mm +/- 0.08. Correct tensile - 500mpa to 750mpa.No score marks, no rust on wire.Every batch 6179
1120
Goods receive notebook / Buff tag and record findings on electronic sytem Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
3Move material to dedicated area for storage.TransportRaw material Safe stacking of wire coils as per allocated areas and FIFO system.Visual inspection.Safe stacking of wire coils as per allocated areas and FIFO systemOn receiving Identification tags Any difficulty experienced during this activity report to Stores Coordinator
4Issue wire to production.IssuingRaw material Issue wire to production.Verification as per buff tag Setter to measure wire diameter with vernierIssue wire to production.Every job as per request Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
5Form U Wire on Zukron 3FormingU Wire Wire shall conform to checking fixture , wire to sit flat in fixture. No rust, Score Marks and Burrs allowed.Visual Inspection and verification in checking fixture. First-off verification by Q.AAs per work instructionFirst-off at start of production. In-process 9 parts every hour and last-off Record on Electronic system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
6Form Outer Wire on Zukron 3.FormingOutter Wire Wire shall conform to checking fixture , wire to sit flat in fixture. No rust, Score Marks and Burrs.Visual Inspection and verification in checking fixture. First-off verification by Q.AAs per work instructionFirst-off at start of production. In-process 9 parts every hour and last-off Record on Electronic system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
7Transport Indivual U Wires & Outter Wires to Spot Welder.TransportU & Outter Wire Correct handling of parts during this activity.Visual verification.N/AEvery order N/A Any difficulty experienced during this activity stop the process and report to Supervisor
8Dressing and cleaning of copper tipsCopper tipsClean tips set to correct height Clean and set to correct height. Heights XXXmm top and XXXmm bottom tip which will have a gap of XXmm between the copper tips.Measure heights with a Tape measure or Steel rule.Heights set prior to welding Cleaning of copper tips every 2 hoursEvery 2 hours Record on inspection system Any problem experienced during this activity report to supervisor.
9Break Strength TestWeld strengthBreaking strength Conduct a chisel and hammer test (To determine weld strength) as part of first off approval.Use a 10-15mm chisel, 1kg hammer for the test.1 part per batchEvery batch Record on inspection system If the test fails, stop and call the supervisor.
10Load U Wire & Outter Wire in welding jigLoadingCorrectly loaded welding jig. Correct loading of wires into the loading jig to ensure a good weld.Visual inspection to ensure wires are touching, no gaps. Ensure all hold-down clamps are in place.Visual inspectionEvery order Visual inspection. First-off in sample inspections Any difficulty in loading jig, stop the process and call the supervisor.
11Welding & inspection of final product WeldingWelded product Welding of product.Product to meet drawing and customer requirements No smash welds, no miss welds, no broken welds and no bent wires.Visual verification in checking fixture for correct fitment.First-off at start of production. In-process 9 parts every hour and last-off Record on inspection system Should the inspection requirements not be correct, stop the process and inform the supervisor.
12Transport welded products to stores for E - CoatingTransportWelded products Correct quantities.Visual inspection.As per job orderEvery order N/A Should difficulty occur during transport inform Supervisor
13Send parts for E Coating.TransportUncoated parts Correct E Coating as per boundary sample.Visual inspection.Every batchEvery order N/A Any difficulty report to manager.
14Receive coated parts.ReceivingCoated products Correct coating on parts. Correct quantity received.Visual inspection.Every batchEvery order N/A Any issues report to Quality and Production manager
15Inspection of E - Coated products.InspectionCoated products Correct coating as per (BSQ7E447) boundary sample. No cracks. colour - black. Visual inspection/ verification.Every orderEvery batch Record on inspection system Any non-conforming parts shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
16Receipt products into stock.ReceiptingCompleted products Correct quantity to be entered on to the stock system.Visual verification.Every batchEvery order F.A Card. Any discrepancies shall be reported to the Stores Coordinator
17Dispatching of products. TransportCompleted products TBSA XXX orange dunage bins XXXX, Pack XXparts in each box.Visual verification.As per job orderEvery order 1101
Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator